 | Location | Access Road (Thanlyin) | 
| Type of Road | 8.7 km Length of Road with 30m Bridge and Infrastructure Work | 
| Asphalt Concrete Road | 8.7km (60,000 Tons) | 
| Location | Yangon | 
| Widening Earthwork | 10 Miles 2 Furlong | 
| Length of Road | 10 Miles 2 Furlong | 
| Type of Road | Widening Concrete | 
| Location | Nay Pyi Taw | 
| Earthwork | 50,508,640 m3 | 
| Concrete Road | 507 miles | 
| Asphalt Concrete Road | 75 miles | 
| Bridges & Culvert | 655 Nos | 
| Bituminous Road | 15 miles | 
| Macadam Road | 10 miles | 
| Location | Hmawbi & Tharyarwaddy | 
| Widening Earthwork | 60 Miles | 
| Length of Road | 60 miles | 
| Type of Road | Asphalt Concrete | 
| Location | Yangon | 
| Widening Earthwork | 6 Miles 4 Furlong | 
| Length of Road | 6 Miles 4 Furlong | 
| Type of Road | Penetration Macadam Road | 
| Location | Yangon | 
| Widening Earthwork | 10 Miles | 
| Length of Road | 23 Miles | 
| Type of Road | Widening Concrete | 
| Road Width | 48 Feet | 
| Location | The Whole Burma | 
| Total Floor Area | 680,371 Sud | 
| No. of Dam | 3 No. | 
| Location | Nay Pyi Taw | 
| No. of roundabout | 10 No. | 
| Location | Bago-Nyaunglaybin, Bago Division | 
| Type of Road | 79.8 KM length of Railway with Civil & Track works and Signalling & Telecommunication works | 
| Location | Yangon & Bago Division | 
| Total Floor Area | 33,844 sqft | 
| No. of Building | 4 No. | 
| Type of project | RCC & Steel Structure (Construction) | 
| Start Date | 30.11.2015 | 
| End Date | 15.3.2018 | 
| Location | Shan State | 
| Type of Road | 11.62 KM length of Penetration Macadam Road with Bridge & Infrastructure |